Follow us :

  • 1. No matter FOB or CIF about the price terms we would try our best to find a lowest freight cost for customers' reference.2.The third-party inspection always gets real and true data from us and we will send production photos to customers if there is no inspection.3.Do our best to help customer arrange the shipment and customs clearance.4.Please Note: we can not guarantee the price is correct if ...

  • Hong Kong, Macau and Singapore , North America, South America, Western Europe, Eastern Europe, East Asia, The Middle East, Africa, Oceania

  • 1.Visit Our factory is the best way to know each other more.2.ISO9001:2008 by international quality system Certificate and The Third Inspection can prove our quality.3.We will attach some relevant photos via email so show our factory, machine and products for you.4.The most professional manufacture in Tianjin,China

  • "Attutude is the status of ideas detemine, Decide the quality of survival, reputation decides success of failure."We sericous control the quality from raw material, we will check the raw material 's surface and its physical property and Chemical properties.When we began to producing, we will control every step and checking the finished products.

  • 1. Sample can be offered with sample charge and courier fee by buyer's side.2. We have full stock,and can deliver within short time.Many styles for your choices. 3. OEM and ODM order are accepted, Any kind of logo printing or design are available.4. Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.5. Our products are produced by our own fac...

  • Yes. All related construction materials.(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)(4) steel coupler (pressed/drop forged coupler)(5) steel plank with hooks ...

  • Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

  • 10-20 days after received the advance payment

  • T/T 30% in advance by T/T ,70% will be before shipment under FOB.T/T 30% in advance by T/T ,70% against the copy of BL under CIF.T/T 30% in advance by T/T ,70% LC at sight under CIF.

  • About 300,00000 tons

  • 1. We have excellent technical team and foreign trade team.2. International standards of production technology and quality inspection 3. We will delivery as contract date strictly.4. Any quality problem we will analysisi and solve it as soon as possible.

  • We are the manufacturer of construction materials for decade years ,Forwar steel do domestic market and export business.

  • Quality first,people foremost, do centennial enterprise